X-Axis Ballscrew Replacement
Parts List
Reference Files
Tools Required
Torque Chart
Step 1: ECPLStep 2: Unlock Maint. Opening / Remove PanelStep 3: Disconnect Motor Connections / Attach Lift AssistStep 4: Remove MotorStep 5: Remove Lube Line from BearingStep 6:Remove Fasteners from BearingStep 7:Open Maintenance DoorStep 8: Remove Lube Line from BallnutStep 9: Remove Fasteners from BallnutStep 10: Insert Jack ScrewsStep 11: Remove BallscrewStep 12: Move ColumnStep 13: Remove / Install New Needle BearingStep 14: Measure CouplingStep 15:Lubricate BearingStep 16: Install BearingStep 17: Install Locknut / CouplingStep 18: Install Inner RaceStep 19: Install InsertStep 20: Move ColumnStep 21: Clean Bearing Mounting SurfaceStep 22: Clean Ballnut Mounting SurfaceStep 23: Install BallscrewStep 24: Install Fasteners into BearingStep 25: Install Lube Line into BearingStep 26: Install Fasteners into BallnutStep 27: Install Lube Line into BallnutStep 28: Clean Mounting SurfaceStep 29: Install Motor / TorqueStep 30: Remove Lift Assist / Install Motor ConnectionsStep 31: Install Panel / Lock Maint. OpeningStep 32: Close Maintenance DoorStep 33: ECPLStep 34: Activate Lubrication and Run-inActivate the Lubrication Cycle several times via the HMI - Prepare - Pwr-up Cond. HMI screen. After the lubrication cycles have been completed, it is now necessary to run-in the ballscrew. This can be accomplished by moving the axis back and forth along the entire length of travel at half rapid speed for 30 minutes. Then allow the ballscrew to cool for 45 minutes. Once completed, the ballscrew can now be fully loaded. |