Activities During Production

Interval Assembly Action Sec.
A B C
8h Cooling lubricant system Check condition of the cooling lubricant 4.6.1
50h Machining unit Checking tool holder blow-off procedure 4.8.3
200h Spindle and control cabinet cooling Check filling level in cooling unit 4.3.1
2000h Machine frame Checking quiet running of the machine 4.12.5
3m Pneumatics Checking automatic drain of filter pressure regulator 4.5.2
3m Pneumatics Checking automatic drain of compressed air filter 4.5.4
3m Pneumatics Checking automatic drain of the maintenance unit for the measuring scale sealing air 4.5.6
x Central lubrication 1 Topping up oil in the lubrication unit tank 5.3.1
x Central lubrication 2 Topping up oil in the lubrication unit tank 5.4.1
x Cooling lubricant system Switch double filter to alternative chamber and clean the clogged one 5.5.1